TAKE IT TO THE PROJECT

Measure once.
Write it down.

Three worksheets for the room, the store and the quote conversation. Fill them in here and print, or download a CSV for your spreadsheet.

Entries stay on this page until you leave or reload. Print or copy them before closing; this page does not save your notes.

Project worksheets

WORKSHEET / WALL

Wall & obstruction survey

Measure the actual treatment area before choosing the pattern. Record every position from one reference corner.

RecordMeasurement / answerWhere to check
Treatment width — top (in)Finished face, excluding trim that remains
Treatment width — middle (in)Same left and right references
Treatment width — bottom (in)Same left and right references
Treatment height (in)Bottom of planned trim to its top
Actual trim width / thickness (in)Measure a sample of the selected profile
Baseboard / casing transitionCompare thickness and edge alignment
Box 1 — label / X / Y / width / heightX from left; Y from treatment bottom
Box 2 — label / X / Y / width / heightInclude outside cover or casing
Box 3 — label / X / Y / width / heightRecord furniture outline or access envelope
Wall condition / old paint checkIdentify needed preparation before disturbance
Usable stock / blade kerf / end trimCheck actual boards and blade

HouseHows · Planning record. Verify on-site conditions, product instructions and written scope.

WORKSHEET / PAINT

Room paint takeoff

Keep surfaces, openings and products separate. This sheet supplies the inputs; it does not assume a coverage or coat count.

Surface / itemWidth × height / areaProduct / notes
Wall A
Wall B
Wall C
Wall D
Door openings to subtractCount only areas not receiving this paint
Window openings to subtractKeep frames/trim in their own estimate
Other unpainted areas
Net wall area (sq ft)Gross area minus excluded areas
Coats / label coverage (sq ft per gal)Use the actual product and application
Allowance (%)Explain the chosen extra quantity
Primer / ceiling / trimSeparate estimate for each product
Container size / price / lotCheck package sizes and return conditions

HouseHows · Planning record. Verify on-site conditions, product instructions and written scope.

WORKSHEET / SCOPE

Contractor scope comparison

Give each contractor the same questions. Record included work, exclusions and allowances before comparing totals.

Question / line itemQuote AQuote B
Exact product / grade / finish
Measured quantities / units
Preparation and repairs included
Removal and disposal
Access, protection and cleanup
Delivery and equipment
Permits / inspection responsibility
Tax amount and taxable scope
Allowance: included dollars / quantity
What changes the price?
Change-order approval process
Payment stages / final completion
Written warranty scope / exclusions
Total on the same confirmed scope
Items still unconfirmed

HouseHows · Planning record. Verify on-site conditions, product instructions and written scope.